1-1. 1ATF including 103 Sig Sqn at Back Beach,
Vung Tau before deploying to Nui Dat. Photo supplied by Reg Dando [1966]
Note: Back Beach, Vung Tau
become the home of 1ALSG.
|
1-2. All ranks bog (Latrine) at Nui Dat.
Smaller one on the right for
Officers only. Photo supplied by Reg Dando [1966]
|
1-3. Members of 103 Sig Sqn arrive at Tan Son
Nhut Airport, Saigon in May 1966. Photo supplied by Reg Dando [1966]
|
1-4. 103 Sig Sqn at Back Beach, Vung Tau
before deploying by Road and Chinooks to Nui Dat. Photo supplied by Reg
Dando [1966]
|
1-5. Nui Dat before the road between 103 Sig Sqn and HQ 1ATF. Photo
supplied by Reg Dando [1966]
|
1-6. Bill Laurie going into HQ 1ATF. Photo
supplied by Reg Dando [1966]
|
1-7. L-R
Bruce Reschke and Reg Dando at Nui Dat. Photo supplied by Reg Dando
[1966]
|
1-8. Chris (Brownie) Brown at Nui Dat. This was before the fortified
defence of the area. Photo supplied by Reg Dando [1966]
Note the sentry on the left
looking to where Kangaroo Pad will be built later.
|
1-9. L-R Chris Brown and Ivan Ward at Nui
Dat. Photo supplied by Reg Dando [1966]
|
1-10. L-R Chris Brown and Gary Houghton at
Nui Dat. Photo supplied by Reg Dando [1966]
|
1-11. SSM WO2 Cliff King having a drink with a
group of OR's including US Army Signal Personnel which were attached.
Photo supplied by Reg Dando [1966]
SSM =
Squadron Sergeant Major
Note: US Army Signal Personnel Sgt on
right of SSM has been identified as Darryl Fontenot.
|
1-12. 103 COMCEN Building at Nui Dat.
AN/MGC-17 and AN/MTC-7 sandbagged (Bottom right) at COMCEN rear. Photo
supplied by Ken Mackenize (104 Sig Sqn)[1966]
Note: Ken saved many
valuable 103 and 104 photos from disposal in an Army Office clean out -
Thanks and Well Done Ken!
|
1-13. AN/MGC-17 and AN/MTC-7 sandbagged at
back of 103 Sig Sqn (1ATF) COMCEN. Photo supplied by Ken Mackenize (104
Sig Sqn)[1966]
Note the line poles
|
1-14. Stan Freeman manning COMCEN front counter.
Photo supplied by Ken Mackenize (104 Sig Sqn)[1966]
|
1-15. 103 COMCEN Lane with Orderly Room
lower right. Photo supplied by Reg Dando [1966]
|
1-16. 103 Sig Sqn COMCEN building. Photo
supplied by Brian Stevens (145 Sig Sqn)[1966]
Note the AN/TRC-24 Radio Set
Antenna in the Trees.
|
1-17. Digging cable route from Line frame to
Ebony Switchboard. Photo supplied by Reg Dando [1966]
|
1-18. Digging cable route from Line frame to
Ebony Switchboard. Photo supplied by Reg Dando [1966]
|
1-19. Digging cable route from Line frame to
Ebony Switchboard. Photo supplied by Reg Dando [1966]
|
1-20. Distribution point for field cable.
Photo supplied by Ken Mackenize (104 Sig Sqn)[1966]
|